Construction Stormwater

 

droplet with grate

seedling


Construction activities that disturb one or more acres of land must obtain a stormwater permit to be authorized under the Utah Pollutant Discharge Elimination System (UPDES). These permits are required to help prevent construction site stormwater discharges from negatively impacting applicable state water quality standards. Proper stormwater controls are critical for stopping these pollutants from entering waterways and the surrounding environment to protect Utah's water.

Construction Stormwater Best Management Practices

BMPs are used to minimize the water quality impacts from construction activities. These practices help prevent pollution, control erosion, and better meet permit requirements. Identify BMPs before a construction project begins for more effective stormwate...